Building Project
Building Project
South Central Community School Corporation and the Board of School Trustees approved a multi-million dollar project to provide additions, renovations, and improvements to the school building.
The tax-neutral project began in the summer of 2024 and includes a three-classroom addition to the elementary school, a two-classroom addition to the high school, renovations to the library/media center, main locker rooms, all restrooms, and the construction of a student activity center building. Some other smaller projects include new casework in elementary classrooms, track resurfacing, and a chiller replacement.
Project Information
Construction Manager: Tonn and Blank
Architect: Elevatus Architecture
Bond Counsel: Ice Miller
Underwriter: Stifel Public Finance
School Attorney: Newby, Lewis, Kaminski, & Jones
Notices
- Notice of Determination 9-19-24
- Notice of Execution 5-16-24
- Notice of Determination 4-11-24
- Notice of 2024 Lease Hearing 4-11-24
- Notice of Additional Appropriation Hearing 4-11-24
- Notice of Adoption of Preliminary Determination 2-15-24
- Notice of Public Hearing 2-1-24
- Notice of Public Hearing 12-21-23
- Notice of Public Hearing 6-1-23
Construction Updates & Photos
-
April 2025
-
March 2025
-
February 2025
-
January 2025
-
December 2024
-
November 2024
-
October 2024
-
September 2024
-
August 2024
-
July 2024
-
June 2024
Project Scope
Classroom Additions
-
IMG 1371
-
IMG 1372
-
IMG 1373
-
IMG 1374
-
Elem Classroom Addition 5
-
Elem Classroom Addition 6
-
IMG 1401
-
IMG 1400
-
IMG 1399
-
HS Classroom Addition 4
-
HS Classroom Addition 5
Completed
- Elementary addition constructed in the front northeast corner of the school building
- Three new upper-grade-level classrooms
- New boys and girls restrooms
- High school addition constructed in the back southwest corner of the school building
- Two new classrooms
Media Center Renovation
-
IMG 1365
-
IMG 1364
-
IMG 1363
-
IMG 1360
-
IMG 1361
-
IMG 1380
-
IMG 1382
-
IMG 1377
-
IMG 1402
-
IMG 1404
-
IMG 1356
-
IMG 1357
-
IMG 1359
-
IMG 1358
Completed
- Reconfiguration of existing library space
- Enlarged makerspace/innovation lab
- Two breakout meeting rooms
- New flexible and soft seating areas
- Addition of three offices and new board room
- Redesigned technology department office
Student Activity Center
In Progress
- Constructed on the practice football field between the baseball and football/track facilities
- Prefabricated metal building with 90x90 indoor activity space
- Training room and health clinic office
- Locker room
- Coach and officials' offices
- Indoor and outdoor accessible restrooms
- Storage rooms
Locker Room Renovations
-
IMG 1370
-
IMG 1366
-
IMG 1369
-
IMG 1389
-
IMG 1387
-
IMG 1367
-
IMG 1390
-
IMG 1386
-
IMG 1391
-
IMG 1368
-
IMG 1388
Completed
- Two varsity team locker rooms
- Two P.E. locker rooms
- Enlarged and reconfigured training room
- Coach offices with restrooms
- Storage rooms
Restroom Renovations
-
IMG 1384
-
IMG 1385
-
IMG 1392
-
IMG 1393
-
IMG 1405
Completed
- Refreshed look to all restrooms in the building
- New fixtures, tile, flooring, lighting, and paint
- New elementary staff restroom
Miscellaneous Projects
-
Track 1
-
Track 2
-
IMG 1396
-
IMG 1394
-
IMG 1397
- Track milling, resurfacing, and painting
- New casework in 16 elementary classrooms including shelving, cabinetry, and sinks
- Chiller replacement
- Back parking lot and driveway resurfacing (Summer 2025)
- Exterior painting of school building (Summer 2025)