South Central Community School Corporation and the Board of School Trustees approved a multi-million dollar project to provide additions, renovations, and improvements to the school building.

The tax-neutral project began in the summer of 2024 and includes a three-classroom addition to the elementary school, a two-classroom addition to the high school, renovations to the library/media center, main locker rooms, all restrooms, and the construction of a student activity center building. Some other smaller projects include new casework in elementary classrooms, track resurfacing, and a chiller replacement.

Project Scope

Classroom Additions

Completed

  • Elementary addition constructed in the front northeast corner of the school building
    • Three new upper-grade-level classrooms
    • New boys and girls restrooms
  • High school addition constructed in the back southwest corner of the school building
    • Two new classrooms

Media Center Renovation

Completed

  • Reconfiguration of existing library space
  • Enlarged makerspace/innovation lab
  • Two breakout meeting rooms
  • New flexible and soft seating areas
  • Addition of three offices and new board room
  • Redesigned technology department office

Student Activity Center

In Progress

  • Constructed on the practice football field between the baseball and football/track facilities
  • Prefabricated metal building with 90x90 indoor activity space
  • Training room and health clinic office
  • Locker room
  • Coach and officials' offices
  • Indoor and outdoor accessible restrooms
  • Storage rooms

Locker Room Renovations

Completed

  • Two varsity team locker rooms
  • Two P.E. locker rooms
  • Enlarged and reconfigured training room
  • Coach offices with restrooms
  • Storage rooms

Restroom Renovations

Completed

  • Refreshed look to all restrooms in the building
  • New fixtures, tile, flooring, lighting, and paint
  • New elementary staff restroom

Miscellaneous Projects

  • Track milling, resurfacing, and painting
  • New casework in 16 elementary classrooms including shelving, cabinetry, and sinks
  • Chiller replacement
  • Back parking lot and driveway resurfacing (Summer 2025)
  • Exterior painting of school building (Summer 2025)